The short answer
Start with the new address, not the move date. Check what internet is available there at least 90 days out, because a new connection can take weeks. Send photos of the comms area, power and cabling before anything is booked. Keep a 4G backup ready for move day, and test inbound calls longer than a minute once you are in.
Why office moves go wrong
Furniture is easy to move on a Saturday. Internet is not. A new connection can take weeks, and the phones depend on it. Moves often go wrong when the new site was not checked first.
- 90 daysWhen to check what internet is available at the new addressLeaves time for a new connection or upgrade
- 1 SIMA 4G backup ready on move day, in case the new connection is notA backup in case the new connection is late
- 60+ secondsThe length of your first test call at the new siteSome faults only show after 40 seconds
The timeline
- 90 days out
Check the new address
- Ask what internet is available at the exact new address, including whether full fibre or Enterprise Ethernet is possible. See nbn full fibre (FTTP) upgrades for business: eligibility, install day and what to check after and Enterprise Ethernet explained: what it does for your business, and when it is worth it.
- If you rent, ask the landlord about the comms room, cabling and any building rules for installers.
- Decide whether the phone system moves as it is, or moves to the cloud at the same time.
- 60 days out
Order and plan the space
- Order the new internet service so it is live before move day.
- Send photos of the comms area, power points and network ports at the new site (checklist below).
- Plan cabling: where each desk, printer, camera and access point goes.
- 30 days out
Book the work
- Book cabling, the phone and network move, and any new equipment.
- Arrange a 4G backup for move day.
- Tell providers about the new address, including the address registered for emergency calls on your phone services.
- 14 days out
Confirm the new site is live
- The new internet connection is installed and tested.
- Record the new site’s public IP if anything depends on it, and plan any app or remote-access changes.
- Label every cable at the old site before it is unplugged.
- Move day
Move, connect, test
- Core network first (modem, router, switch), then phones, then everything else.
- Run the move-day tests below before staff arrive.
- Week after
Tidy up
- Cancel the old site’s services only after the new ones have worked for a week, and after any numbers have moved.
- Update site records with photos of the new set-up.
Photos to send before anything is booked
Photos taken on a phone help avoid surprises. Take these and send them in one message.
New-site photo list
0 of 9 doneThe phones: the part that catches people out
- Cloud phone system
Mostly plug in and go
Handsets connect to the internet at the new site and sign in. Update the emergency address on each service, and test.
- On-site system
A project in its own right
The box, its lines, port forwarding, the public IP and every mobile app setting move with it. Plan a separate job for the app changes.
- Numbers
Usually they move with you
Moving within the same area often keeps your numbers; ask your provider. Changing provider at the same time means a port. See Porting your business numbers without losing calls.
Move-day tests
Run these before staff start work at the new site. Tick each one off on the planner.
Internet on a cable
YouA computer plugged into the network reaches websites. If not, switch to the 4G backup and call your provider.
Inbound and outbound calls
YouFrom a mobile to the main number and to a direct line, and out to a mobile. Hold one call for over a minute.
Greetings and hold music
YouHear the welcome and the hold music as a real caller, not from inside the office.
Voicemail to email and the mobile apps
YouLeave a message and check it arrives. Test the app on mobile data.
Payments, printers and cameras
YouA test transaction, a test print and a check of the cameras from outside.
Wi-Fi in every area
YouWalk the site with a phone. Note any dead spots. See Business Wi-Fi dead spots: what to check before buying equipment.
Phone services carry a registered address. If it still shows the old office, a provider may hold the wrong address for emergency calls. Ask each phone provider whether it needs updating, and see ACMA: Emergency calls.
Sources and further reading
- nbn: Upgrade your business to nbn full fibre
- nbn: Network status and outage check
- nbn: What happens in a power blackout
Checked 12 November 2026. Product menus and provider rules change; check the linked source if something looks different.